579th
Strategic Missile Squadron

    SM-65          Atlas F      1962-1965

                Walker Air Force Base
                 Roswell, New Mexico

 

                                       

  Home

  Contact

  Members

  In Memory

  Links

  Photos

  Documents

  Locations

  Reunions

  Newsletters

  What's New


Documents

This page is where documents pertaining to the 579th SMS will be listed.  There will be different sections including maps, historical documents, etc.  During the operational period of the 579th, three of the sites were destroyed due to missile explosions.  There will be a section of documents dedicated to the sites destroyed by the explosions.  If you should have any documents that you wish to share, please contact us.

Many of the documents are available for download to your system.  PLEASE NOTE:  Take note of the file sizes before downloading.  These files are large in size and may take some time to download.  A high speed Internet connection is recommended.  These files can be viewed using Acrobat Reader.  You can download your free copy of Acrobat Reader here.  To save the file to your local system, right click the PDF file name or the PDF icon and choose the "Save Target As" option.

Maps

AF-D-M-579-99-RO-00001.jpg (79984 bytes)    AF-D-M-579-99-RO-00002.jpg (77240 bytes)

 

 

Newspaper Articles

 

Site 1 Explosion - June 3, 1963

           

 

 

   

Missile-Anea Article for August 20th, 1964 - AF-N-O-579-99-ZZ-00001.pdf

 

 

Diagrams

AtlasF_Color_LCCLayout.jpg (102025 bytes)   SAC_CEM_21-SM65F-2-19-8_Page1-11.jpg (123981 bytes)   SAC_CEM_21-SM65F-2-19-8_Page1-12.jpg (136257 bytes)   TO_21-SM65F-2-19-8_Page3-6.jpg (102812 bytes)

AtlasF_Color_SiloLayout.jpg (152082 bytes)   AccessAndWalkways_G-2.jpg (119014 bytes)   AccessAndWalkways_G-4.jpg (149841 bytes)   AccessAndWalkways_G-6.jpg (126451 bytes)

 

 

Development

(22 Mb)   SAC Missile Chronology 1939-1988

(19 Mb)    Silo Full Scale Mockup Photograph Record - Volume1

 

 

Operational Readiness Training

(15.5 Mb)   Silo Familiarization Guide

 

 

General Dynamics

(12.5 Mb)   Integrating Contractors Base Activation Project Manual

(17.8 Mb)   Ground Operational Equipment List

(53.1 Mb)   Ground Support Equipment List

 

 

Deactivation

(31.3 Mb)   AFLC Phaseout Atlas E F Titan1

(8.8 Mb)   Atlas Deactivation Procedure A109

(3.5 Mb)   History Of Atlas Phaseout

(34.9 Mb)   SBAMA Equipment Removal Plan Atlas F

(22.8 Mb)   SBAMA Phaseout Atlas E F Titan1

 

 

Unit History

(15.4 Mb)    579thSMS Unit History - January 1962

(20.4 Mb)    579thSMS Unit History - February 1962

(10 Mb)    579thSMS Unit History - May 1962

(18 Mb)    579thSMS Unit History - June 1962

(12 Mb)    579thSMS Unit History - July 1962

(17.8 Mb)    579thSMS Unit History - August 1962

(13 Mb)   579thSMS Unit History - September 1962

(13 Mb)    579thSMS Unit History - November 1962

(14.4 Mb)   579thSMS Unit History - January 1963

(13.2 Mb)   579thSMS Unit History - February 1962


 

Home ]

Please contact us with questions or comments about this web site.
Copyright © 2005-2008           579th SMS           All Rights Reserved.